Supply and installation support, 2no. Bridge structures, 36x Tub girders, 8x Box girders, Girder lengths 18m-24m...
Full design, supply and installation of steel superstructure, 118m long services bridge over the Waikato river...
Supply and installation support, Pre-assembled for speed of installation over motorway on night closures
Supply and installation support, Two spans of replacement half through plate girders 1.9m deep
Supply 20m high Monopole mast and fittings customised for helicopter installation, Eastbridge...
Supply of 48 custom made heavy fixed and sliding rail bridge bearings, Earthquake strengthening works...
Supply and Install support, 361t of Sculpted arch manfucated from plates up to 40mm thick, Concrete...
Supply of various temporary works structures to enable HEB to construct the concrete wharf: Concrete...
Design and supply: Epule Truss bridge 48m long double lane, Mele Truss bridge 28m long double lane...
Design and supply 8x PGB bridges
Supporting Napier Engineering Company NEC to demolish the old dryer and install the new...
Supply and installation support
Supply and installation of 3kms of railing
Supply and installation of 450lm of railing
Pandora, 12 Mersey St, Napier City, New Zealand